When conducting surface preparation work in wastewater treatment plants, there are many factors to consider before blasting ever begins. For example: protecting the pipes, sensitive equipment, and electrical conduit from abrasive dust and ricochet. Not to mention ensuring that the ventilation system is not overwhelmed with abrasive dust.
Read more >
Unexpected jobsite findings when combined with an extremely tight deadline adds a challenging layer to projects that some contractors can’t overcome. This was not the case with Corrosion Control Resources, Inc. (CCR) who arrived on the scene at Arlington Water Utilities Pump Station expecting to hand blast with coal slag, but ended up robotic blasting with Sponge Media.
Read more >
The Miss Ellis Island is one of the boats that carries passengers from the New Jersey-based marina across New York Harbor and onto Ellis Island. Getting ready for the busy summer tourist season includes conducting maintenance on the ferries, and this past year, the Miss Ellis Island was due for some much needed recoating on the walkways and decks.
Read more >
Structures within wastewater treatment plants are exposed to extreme environmental conditions each and every day. Coatings failure in these facilities are common occurrences. If coatings issues are neglected, damage from corrosion can lead to plant shutdowns and costly replacement of assets.
Read more >
Lighthouses are subject to Mother Nature’s harshest conditions: wind, rain, and constant exposure to salt water from the pounding waves of the ocean. It comes as no surprise that these structures and their various components require routine rehabilitation and restoration.
Read more >
Building production capacity at Russia's largest steel and steel-related mining companies doesn’t happen without planning, staging, careful product selection and execution. PAO Severstal announced their plans to add a third blast furnace to the company’s Cherepovets Steel Mill in the Vologda Region, Russia. Corresponding with the install was construction of a wet cleaning scrubber and demister.
Read more >
Lead paint removal is a challenge regardless of location and circumstances, but even more so when the process takes place in a busy train station. This was the case when Avalotis Corporation was tasked with a lead paint removal, surface preparation, and high-performance coating system application at the 30th Street train station in Philadelphia, PA.
Read more >
Wilson Hall (recently renamed Friedman Hall) is one of the most heavily used buildings on the Brown University campus. The Romanesque-style (circa 1891) structure was built at the bequest of George Francis Wilson and was designed by architects Gould and Angell to expand Brown’s lecture and classroom space.
Read more >
In February 2019, work began on the decommissioning of the Battery Street Tunnel in Seattle, Washington. Completed in 2022, this project was a huge undertaking that included removing the tunnel’s utility and mechanical systems, removing decades of automotive soot buildup from the tunnel, filling the tunnel, and sealing its entrances.
Read more >
In the early hours of a windy Sunday morning, a massive, 10-alarm fire broke out in the downtown area of Waltham, Massachusetts. The fire completely destroyed a condo complex that was under construction, leaving severe soot damage throughout the entire parking garage next door.
Read more >